Big Hill Pond SP Ranger Residence Repairs

State of Tennessee · Bid Brief

Deadline
Thu, 01 Oct 2026 04:59:59 GMT stated by source
Source text: 09/30/2026 · Central time
Location
Not stated by the source
Status
open derived
Solicitation number
32701-14007

Scope

From: Specifications

Ranger Residence Repairs Project
Big Hill Pond State Park
3907 Wolfpen Road
Pocahontas, TN 38061
This request for bids is for a contract to furnish all material, equipment, supplies, and labor
necessary for repairs to rangers residence at Big Hill Pond State Park.
General Conditions
1) On-Site work shall be performed between receipt of signed contract or purchase order and
December 1st, 2026 unless a written exception is granted by the Facilities Management
Regional Manager.
2) For this project, the Contractor and applicable subcontractors shall possess an active BC, BC-
A, BC-B, BC-b(sm), or BC-C Tennessee Building Contractor license prior to submitting a bid.
Failure of the contractor and applicable subcontractors to provide copies of their appropriate
license shall result in the disqualification of the bid. All licenses shall be verified via Tennessee
Commerce and Insurance database before project award.
3) The Contractor shall not assign this contract or enter into a subcontract for this project without
prior written approval of Facilities Management. The Contractor’s bid shall include a
Declaration of Intended Use of Subcontractor(s) form that clearly states the intent to use a
subcontractor, along with their name and license number. Facilities Management reserves the
right to reject a bid in whole or a subcontractor, based upon failure to possess an appropriate
active TN builder’s license. After project award, any proposed substitution or addition of a
subcontractor shall require written Facilities Management acceptance and approval before
being allowed on-site or perform any work under this contract. All subcontractors are required
to have an active TN building contractor license for the applicable work to be performed before
and throughout the project. Any proposed subcontractor failing to meet these requirements are
not allowed to perform work on any portion of this project.
4) All work shall comply with state-approved versions of the IBC, standards, regulations, other
applicable codes, manufacturer’s recommendation, and best practices. Contractor is
responsible for all permits and associated fees.
5) Only the Facilities Management Project Manager or Facilities Management Regional Manager
can approve any alterations, modifications, and substitutions of the specifications or
requirements of the project. No additional work shall be authorized unless pre-approved by
either the Project Manager or Regional Manager in writing. Park/Hospitality management and
staff are not authorized to make any changes, deletions, or additions to the project or accept
any portion of the work. This contract shall be modified only by a written agreement signed by
all parties. Any work performed outside of the written scope with any written change orders will
be the responsibility of the contractor or others and not Facilities Management. All questions,
directives, and acceptance shall come only from either the Facilities Management Regional
Manager and/or Projec
Show more
t Manager.
6) Contractor shall keep the jobsite clean and safe and leave in a neat and tidy manner.
7) All color selections shall be provided to the contractor by the Facilities Management Project
Manager.
8) All material substitutions must be pre-approved prior to bid acceptance.
9) All materials shall be installed per manufacturers’ recommendation, industry best practice,
and applicable code.
10) All dimensions listed are approximate. Contractor is solely responsible for verifying actual
dimensions prior to ordering any materials or bidding. No allowances shall be made due to a
bidder neglecting to visit the site and verifying dimensions and conditions.
11) All work performance under this Contract shall be under the full-time direction of the
Contractor. The Contractor shall be responsible for work and performance, and damages of
any subcontractors and/or independent contractors or laborers hired in connection with the
work under this Contract.
General Scope of Work
Description of Demolition or Associated Work
All debris shall be removed from the park property and disposed of in accordance with all
applicable regulations, unless specifically noted.
1) The Contractor shall demo existing roofing materials down to decking and remove any
damaged or decayed decking.
2) The Contractor shall be responsible for the removal of the existing vinyl siding, foam board,
soffit, fascia, and trim. Caution shall be taken to protect windows as they shall not be
replaced.
3) The Contractor shall remove gutters, down spouts, carport ceiling and all insulation in attic.
4) The Contractor shall notify the listed contacts if any additional damage is found and shall not
proceed until authorized.
Description of New Work
Roofing:
1) Remove existing roofing material, underlayment, starter strips, flashing, accessories down
to the existing lumber. Replace damaged or decayed wood. Refer to the manufacturer’s
recommendations for substrate preparation.
2) The Contractor is responsible for modifying or making additions to roof substrate as
required to provide adequate rigidity, or anchoring points for the roof system. Check for any
high and low spots in the deck, which will cause waviness in the panels.
3) The Contractor shall provide and install all new flashing, drip edge and ridge vent.
4) The deck shall be covered with thirty (30) pound felt or the equivalent in typar. Allow a four
(4) to six (6) inch overlap. Or the equivalent recommended by the manufacturer.
5) There shall be a minimum overhang on the eaves of one (1) inch, and a minimum of two (2)
inches on the drip side.
6) Purlin fasteners shall be of galvanized or outdoor type deck screws. Panel fasteners shall be
Wood fast number nine (9) – one (1) inch. Attaching trim through the rib shall be Wood fast
number nine (9) – two (2) inch. Refer to manufacturers’ recommendations for placing and
spacing. All panels and trim shall be twenty-nine (29) gauge or better.
7) Roof fasteners shall be sealed or have sealed washers on the exterior side of the covering to
waterproof the fastener’s penetration. Washer material shall have minimum diameter of
three eighths (3/8) inch. Color shall match panels. Trim fasteners shall match trim color.
8) Closure strips shall be closed cell or solid cell or neoprene and be pre-molded to match the
configuration of the covering and shall not absorb or retain water. All tape sealants shall be
pressure sensitive, solid sealing tape with a release paper backing. Provide permanently
elastic non sagging non staining seal.
9) The use of two (2) inches by four (4) inches pressure-treated yellow pine purlins shall be
permissible to this agency upon approval from the metal manufacturer. The spacing of such
shall be no wider than sixteen inches and shall be continues the length with no gaps or
parts in material. Sixteen (16)-inch spacing on substrate shall allow wind uplift loads equal
to one hundred (100) pounds psf. All five (5) rib roofing panels and trim shall be of
twenty-nine (29) gauge or better.
The Contractor shall be responsible for inspection of materials upon delivery. Any damaged,
bent or irregular panels shall not be used or accepted by this agency. Store bundles in a
manner to avoid buckling or bending.
Siding:
1) The Contractor shall provide and install all new fiber cement material and non-woven house
wrap shall be installed according to the manufacturer’s installation requirements. The
Contractor shall be responsible for staying within the spacing requirements for fasteners of
the manufacture’s recommendations. If the substrate is unsuitable for Hardie installation,
the Contractor shall remove and replace with minimum five eighths (5/8) plywood. (If walls
are not wrapped in at least five eighths (5/8) plywood or equal material.) Any void found in
insulation shall be filled. The Contractor shall install five eighths (5/8) decking grade
plywood for the Hardie base.
2) The Contractor shall provide and install in a board and batten pattern with battens at twelve
(12) inches on center with horizontal band board as required.
3) The Contractor shall be responsible for the installation of flashing over the doors, windows,
heating ducts, and where siding meets the ground around the bottom of the wall. The
flashing shall have a z-bar shape and have a hem or crimp on the outside edge.
4) The Contractor shall provide and install new fiber cement trim around all doors, windows,
heating ducts, inside and outside corners meeting manufactures specifications as listed.
5) The Contractor shall provide and install new soffit with prevented Hardie fiber cement soffit
prime and paint.
6) The Contractor shall be responsible for caulking all butt joints, inside and outside corners,
door, and window trim, and anywhere caulking is required. All butt joints shall have weather
barrier installed behind joint and caulked.
7) The Contractor shall supply and install all fiber cement materials, for rangers’ residence.
8) The Contractor shall provide primer and two (2) coats of high-quality Sherwin Williams Park
brown paint to all siding, fascia and trim.
9) The Contractor shall replace gable vents with equal size screened louvered vents.
10) The Contractor shall provide and install fiber cement board to ceiling of carport.
11) The Contractor shall provide and install new six (6) inch gutters with gutter guards and five
(5) inch down spouts.
12) The Contractor shall provide and install R-19 bats of insulation in attic of residence.
Approved Brands and Specifics (or Pre-approved Equal)
Item Approved Brand or
Pre-Approved Equal
Specific Requirements
House wrap Dupont, Kingspan Non-Woven with 10-year warranty
Flashing Amerimax Aluminum flashing
Caulking Dap, Titebond Elastomeric Joint Sealant complying /ASTM C920
Grade NS, class 25 or higher or Latex Joint Sealant
complying/ ASTM C834
Paint Sherwin Williams,
PPG
Exterior Acrylic Latex with lifetime limited warranty
from distributor
Woodgrain
Siding & Trim
James Hardie Fiber cement with 30-year warranty
Inside & outside corners 5/4 x 3.5 inch
Batons 5/4 x 3.5 inch, Band boards 1 x 4
Metal roofing &
Trim
Locally sourced 5 Rib 29ga. or better
Underlayment Tyvek Factory recommendations for metal
Soffit James Hardie Pre-vented Fiber cement with 30-year warranty
Insulation Owens Corning R-19 or better bats of insulation
Gutters Locally sourced 6-inch gutters and 5-inch down spouts with leaf
guards
Purlins Locally sourced 2 x 4 pressure treated pine
Specific Instructions
1) The Contractor shall purchase an approved brand of paint from a distributor.
2) The Contractor shall be responsible for any clean-up of spilled paint and/or over spray.
3) This is a turnkey job, and all aspects shall be left in a finished condition.
4) The Contractor shall coordinate work with park management.
Paint Specifications:
I. SURFACE PREPARATION
A. All surfaces to be painted shall be clean, cured, dry and free of rust, mill-scale, oil, grease,
dirt, salts, wax, efflorescence, mildew, surface deposits or loose or scaling paint.
B. All gaps must be filled with approved caulk.
C. Glossy surfaces of old paint must be dulled.
D. Prepared surface must be protected by use of specified and approved primer.
E. Surface must be inspected by park Facilities Management representative prior to coating
application; however, prepared non-protected metal substrates must be immediately
primed.
II. COATING APPLICATION
A. Coating may be applied by brush, applicator pad, roller, convention or airless spray in a
minimum of two coats or as otherwise specified.
B. Specific dry film thickness recommended by manufacturer must be achieved.
C. Even coats, of complete coverage, which are free from sags, drips, streaks and bubbles must
be obtained.
Additional Terms and Conditions
1) All aspects of this job shall be left in a finished condition: All finish work, interior and exterior
walls and trim, finish painting, caulking and final cleanup are included in this contract.
2) Contractor shall be responsible for determining where all utilities are on the job site and care
should be taken to protect the utilities from any damage caused by the demo/construction. This
shall include any underground utilities around the job site area. If damage occurs, it shall be
repaired within a 24-hour period from the time damage occurs.
3) Contractors shall perform work on regular time and shall invoice work time and material not to
exceed the quoted price. Any variance in quote shall be addressed only with a representative of
the Facilities Management Regional Office before any additional work is undertaken or
materials ordered.
4) Work shall be scheduled to avoid any interference with normal operation of the park as much
as possible. During the construction period, coordinate construction schedules and operations
with the park manager. Work shall be conducted during the normal business hours of
Monday through Friday, 8:00 a.m. to 4:30 p.m., unless an alternate schedule is approved
by Facilities Management.
5) Successful contractors shall schedule and attend a pre-construction conference where a pre-
construction form shall be signed by Facilities Management, Contractor and Park Manager or
park representative before work can begin. Contractor shall also schedule and attend a final
inspection where a final inspection form shall be signed by Facilities Management, Contractor
and Park Manager or park representative before final invoice shall be paid.
6) The Contractor shall protect areas adjacent to his work and shall be required to repair any
damage they may cause. Contractor shall protect work of other trades. Contractor shall correct
any painting related damage by cleaning, repairing, or replacing, and refinishing as directed by
Facilities Management. Contractor shall leave residences and other buildings in a habitable
manner after hours by securing unfinished openings.
7) Workmanship is to be warrantied for not less than one year from date of final inspection.
Materials shall be warrantied as per manufacturer’s warranty.
8) Unless otherwise indicated, all materials, equipment, and supplies shall be new and in good
condition, UL listed when applicable, and all work accomplished in a manner acceptable to
Facilities Management.
9) Clean up of the project site shall be the responsibility of the contractor. Contractor to assure
that job site is clean of nails, debris, etc., at end of each day to ensure safety. Contractor shall
clean up and haul away all scraps when work is completed to an approved location off state
property.
10) Contractor, employees, and sub-contractors shall be licensed, certified, or registered as
required. They shall be registered in the State of Tennessee Edison purchasing system.
11) The State of Tennessee shall not be held liable for any damage, loss of property, or injury of
personnel resulting from actions of the contractor and/or his/her sub-contractors or
employees.
12) At all times, the Contractor shall have a copy of project specifications, permits, and certificate
of insurance on-site.
13) Notwithstanding any use of the approved subcontractors, the Contractor shall be the prime
contractor and responsible for compliance with all terms and conditions. The State reserves the
right to request additional information or impose additional terms and conditions before
approving the assignment of this contract in whole or in part or the use of subcontractors in
fulfilling the Contractor's obligations under this contract.
14) The Contractors and all subcontractors are not authorized to day laborers or temporary labor on
this project without the express written permission of Facilities Management.
15) The Contractor shall have a Certificate of Insurance on file with Facilities Management and in
compliance with state regulations. Contractor shall have insurance as shall protect the
contractor from claims which may arise out of or result from the contractor’s operations under
the contract and for which the contractor may be held legally liable, whether such operations
be by the contractor or by sub-contractor or by anyone directly or indirectly employed by any of
them, or anyone associated with them for whose acts they may be liable. Sub-contractors shall
also be registered in the State of Tennessee Edison purchasing system, be listed on the bid
application, submit copy of applicable license, and shall show proof of insurance and have
workers compensation.
16) Note: Before the Contract resulting from this Invitation to Bid is signed, the apparent successful
proposer shall be registered with the Department of Revenue for the collection of Tennessee
sales and use tax. The State shall not approve a contract unless the proposer provides proof of
such registration. The foregoing is a mandatory requirement of an award of a contract pursuant
to this solicitation.
17) Invoice shall be submitted for payment not before project completion and final project
acceptance but also no later than 10 days after project completion and acceptance. A copy of
the invoice shall be submitted to: Susan Blankenship office:731-968-6608, cell:731-307-9718
Email: [email protected]
18) Facilities Management Regional Contacts for this project are:
Project Manager: Reid Mullins, Phone: c 731-412-4042, o 731-968-6608
Email: [email protected]
Regional Manager: Steve Hicks, Phone c 731-552-0659, o 731-968-6608
Email: [email protected]

Documents

Requirements worth checking

Freshness and changes

First seen Thu, 03 Sep 2026 21:51:07 GMT. Last seen Sun, 06 Sep 2026 13:51:14 GMT (about 4h ago). Last verified: not yet re-verified.

No material changes recorded since first seen.

Official source

https://www.tn.gov/generalservices/procurement/central-procurement-office--cpo-/supplier-information/invitations-to-bid--itb-.html

BidRadar summarizes and normalizes public procurement information. The issuing agency's official notice and solicitation documents control -- verify requirements and deadlines at the official source before acting.

How we know each fact

FactBasis
Title, issuing agency, solicitation number, contactStated by the source: copied from the agency's posting as written.
DeadlineStated by the source as “09/30/2026”, read in Central time.
StatusDerived: the source posts no status, so the record is open until its deadline passes and closed after.
CategoryNot assigned. The automatic rules cover HVAC and mechanical work only; this record is still searchable by keyword and matched by the keywords in your profile.
RequirementsRead from the solicitation documents by fixed patterns, each shown with the sentence it came from. Nothing is summarised or paraphrased.

This is version 1 of the record, built from an archived copy of the agency's page (fetch fch_3axanl6mpeewxrjptoz3lyyf2z, object obj_oa94dxpgqehu7ole8ngt3ch3kb, sha256 63022d903246a04403575cd75d684eee90662d0033acfa85e1de9987c10541ae). It passed BidRadar's publication checks: a title, an issuing agency, a working official link, and a deadline that is either resolved or explicitly unknown. No text on this page is written by an AI: every value is the agency's own words, a normalisation of them (dates and times), a rule-based category, a sentence read from a document, or marked unknown.

Report an issue

See something wrong with this listing? Let us know: