Cumberland Mtn State Park Tree Removal
Thu, 17 Sep 2026 04:59:59 GMT stated by source
Source text: 09/16/2026 · Central time
Not stated by the source
open derived
32701-13986
Scope
From: Specifications
Page 1 of 5 Hazardous Tree Removal Cumberland Mountain State Park 24 Office Drive Crossville, TN 38555 This request for bids is for a Contract to furnish all material, equipment, supplies, and labor necessary to remove two hundred thirty-eight (238) hazardous trees. General Conditions 1) On-Site work shall be performed between receipt of signed Contract or Purchase Order and November 30th, 2026, unless a written exception is granted by the Facilities Management Regional Manager. 2) For this project, the Contractor and applicable subcontractors shall possess an active BC-B (sm) BC-B or BC-C, BC-29, S -Tree Trimming or higher Tennessee Building Contractor license prior to submitting a bid. Failure of the Contractor and applicable subcontractors to provide copies of their appropriate license shall result in the disqualification of the bid. All licenses shall be verified via Tennessee Commerce and Insurance database before project award. 3) The Contractor shall not assign this Contract or enter into a subcontract for this project without prior written approval of Facilities Management. The Contractor’s bid shall include a Declaration of Intended Use of Subcontractor(s) form that clearly states the intent to use a subcontractor, along with their name and license number. Facilities Management reserves the right to reject a bid in whole or a subcontractor, based upon failure to possess an appropriate active TN builder’s license. After project award, any proposed substitution or addition of a subcontractor shall require written Facilities Management acceptance and approval before being allowed on-site or perform any work under this Contract. All subcontractors are required to have an active TN Building Contractor license for the applicable work to be performed before and throughout the project. Any proposed subcontractor failing to meet these requirements are not allowed to perform work on any portion of this project. Hazardous Tree Removal Page 2 of 5 4) All work shall comply with State-approved versions of the IBC, standards, regulations, other applicable codes, manufacturer’s recommendation, and best practices. The Contractor is responsible for all permits and associated fees. 5) All bids shall be submitted via Edison portal. Do not disclose your bid to any other person. 6) Only the Facilities Management Project Manager or Facilities Management Regional Manager can approve any alterations, modifications, and substitutions of the specifications or requirements of the project. No additional work shall be authorized unless pre-approved by either the Project Manager or Regional Manager in writing. Park/Hospitality management and staff are not authorized to make any changes, deletions, or additions to the project or accept any portion of the work. This Contract shall be modified only by a written agreement signed by all parties. Any work performed outside of the written scope with any written change orders will be the responsibility of the Contractor or ot
Show more
hers and not Facilities Management. All questions, directives, and acceptance shall come only from either the Facilities Management Regional Manager and/or Project Manager. 7) The Contractor shall keep the jobsite clean and safe and leave in a neat and tidy manner. 8) All dimensions listed are approximate. The Contractor is solely responsible for verifying actual dimensions prior to ordering any materials or bidding. No allowances shall be made due to a bidder neglecting to visit the site and verifying dimensions and conditions. 9) All work performance under this Contract shall be under the full-time direction of the Contractor. The Contractor shall be responsible for work and performance, and damages of any subcontractors and/or independent contractors or laborers hired in connection with the work under this Contract. General Scope of Work Description of Demolition or Associated Work All debris shall be removed from the park property and disposed of in accordance with all applicable regulations, unless specifically noted. 1) The Contractor shall remove two hundred thirty-eight (238) hazardous trees and dispose of at site designated by Park Staff. 2) The Contractor shall grind seventy-two (72) stumps on all identified trees and shall dispose of all shavings at site designated by Park Staff. Hazardous Tree Removal Page 3 of 5 New Work 1) The Contractor shall remove two hundred thirty-eight (238) hazardous trees and dispose of at site designated by Park Staff. 2) The Contractor shall grind seventy-two (72) stumps and shall dispose of shavings at designated sites that Park Staff has chosen. 3) The Contractor shall level and smooth all sites as level as close as possible. 4) The Contractor shall seed and straw all disturbed sites during this project. Specific Instructions 1) The Contactor shall cut and remove two hundred thirty-eight (238) trees and shall dispose of in designated site on state property that Park Staff will provide. The Contractor shall cut all stumps to a height of twelve (12) inches or less from the ground. 2) The Contractor shall grind seventy-two (72) stumps of identified trees and shall dispose of shavings and debris in designated areas on State property provided by Park Staff. 3) The Contractor shall level and smooth out all disturbed areas as close as possible. 4) The Contractor shall seed and straw all disturbed areas during this project. 5) The Contractor shall coordinate with the Park Manager during this project to work around cabin rental dates and ensure the safety of our guests. Hazardous Tree Removal Page 4 of 5 Additional Terms and Conditions 1) All aspects of this job shall be left in a finished condition: All finish work and final cleanup are included in this Contract. 2) The Contractor shall be responsible for determining where all utilities are on the job site and care should be taken to protect the utilities from any damage caused by the demolition/construction. This shall include any underground utilities around the job site area. If damage occurs, it shall be repaired within a 24 (twenty-four)-hour period from the time damage occurs. 3) The Contractor shall perform work on regular time and shall invoice work time and material not to exceed the quoted price. Any variance in quote shall be addressed only with a representative of the Facilities Management Regional Office before any additional work is undertaken or materials ordered. 4) Work shall be scheduled to avoid any interference with normal operation of the Park as much as possible. During the construction period, coordinate construction schedules and operations with the Park Manager. Work shall be conducted during the normal business hours of Monday through Friday, 8:00 a.m. to 4:30 p.m., unless an alternate schedule is approved by Facilities Management. 5) The successful Contractor shall schedule and attend a pre-construction conference where a pre-construction form shall be signed by Facilities Management, Contractor and Park Manager or Park representative before work can begin. The Contractor shall also schedule and attend a final inspection where a final inspection form shall be signed by Facilities Management, Contractor and Park Manager or Park representative before final invoice shall be paid. 6) The Contractor shall protect areas adjacent to his work and shall be required to repair any damage they may cause. The Contractor shall protect work of other trades. The Contractor shall correct any painting related damage by cleaning, repairing, or replacing, and refinishing as directed by Facilities Management. The Contractor shall leave residences and other buildings in a habitable manner after hours by securing unfinished openings. 7) Workmanship shall be warrantied for not less than one year from date of final inspection. Materials shall be warrantied as per manufacturer’s warranty. 8) Clean up of the project site shall be the responsibility of the Contractor. The Contractor shall assure that job site is clean of nails, debris, etc., at end of each day to ensure safety. The Contractor shall clean up and haul away all scrap when work is completed to an approved location off State property. Hazardous Tree Removal Page 5 of 5 9) At all times, the Contractor shall have a copy of project specifications, permits, and Certificate of Insurance on-site. 10) The Contractors and all subcontractors are not authorized to day laborers or temporary labor on this project without the express written permission of Facilities Management. 11) Note: Before the Contract resulting from this Invitation to Bid is signed, the apparent successful proposer shall be registered with the Department of Revenue for the collection of Tennessee sales and use tax. The State shall not approve a Contract unless the proposer provides proof of such registration. The foregoing is a mandatory requirement of an award of a Contract pursuant to this solicitation. 12) Invoice shall be submitted for payment not before project completion and final project acceptance but also no later than 10 (ten) days after project completion and acceptance. A copy of the invoice shall be submitted to: Deborah Quist, 160 State Circle, Rocky Top, TN 37769, 865-606-0785, [email protected]. 13) Facilities Management Regional Contacts for this project are: Regional Manager: Chad Young, 865-606-1551, [email protected] Project Manager: Gary Greenwood, (865) 806-8300, [email protected] Nothing Follows
Documents
- Specifications (5 pages)
- Event 32701-13986 (9 pages)
- Pre-Bid Info (could not be retrieved)
- Terms and Conditions (21 pages)
Requirements worth checking
- Licensure: Contractor's license required read from documentFrom Event 32701-13986: “For bids over $25,000 requiring a contractor's license, Respondent shall provide the following for contractor and any subcontractors, if applicable: Company's Tennessee State Contractor License Number License Classification(s) Applicable to Bid License Expiration Date Required: Yes Mandatory Response:No Response Comments The respondent shall indicate whether or not they plan to sub-contract: No: The respondent does not anticipate using a sub-contractor at”
Freshness and changes
First seen Wed, 02 Sep 2026 06:41:24 GMT. Last seen Sun, 06 Sep 2026 13:51:16 GMT (about 4h ago). Last verified: not yet re-verified.
Official source
BidRadar summarizes and normalizes public procurement information. The issuing agency's official notice and solicitation documents control -- verify requirements and deadlines at the official source before acting.
How we know each fact
| Fact | Basis |
|---|---|
| Title, issuing agency, solicitation number, contact | Stated by the source: copied from the agency's posting as written. |
| Deadline | Stated by the source as “09/16/2026”, read in Central time. |
| Status | Derived: the source posts no status, so the record is open until its deadline passes and closed after. |
| Category | Not assigned. The automatic rules cover HVAC and mechanical work only; this record is still searchable by keyword and matched by the keywords in your profile. |
| Requirements | Read from the solicitation documents by fixed patterns, each shown with the sentence it came from. Nothing is summarised or paraphrased. |
This is version 1 of the record, built from an archived copy of the agency's page (fetch fch_nc6c7sggh9jb70aj8gxfh0uj6n, object obj_96ihnw06b7yzoaa0avlgbuwcsf, sha256 be7e7c7a719c860cd8a8c7a7746b44fc89df36e7ef38681b5eb08b83fb780cc3). It passed BidRadar's publication checks: a title, an issuing agency, a working official link, and a deadline that is either resolved or explicitly unknown. No text on this page is written by an AI: every value is the agency's own words, a normalisation of them (dates and times), a rule-based category, a sentence read from a document, or marked unknown.
Report an issue
See something wrong with this listing? Let us know: